The ADK modular design of a hospital exhibits excellent planning capabilities. The prefabrication of the individual stages of construction guarantees exact production times at the highest level of quality.

With a degree of prefabrication of up to 90 percent including treatment equipment, the hospital is pre-produced in its own ADK plant. The final completion of the building is then implemented step by step with almost no noise pollution at the destination. This guarantees the quality standards defined in the planning.

Another huge advantage of modular construction is that virtually no space is needed for construction site facilities.