FIRST IMAGES OT EXTENSION
For the SANA Klinikum Offenbach, ADK has realized an OT extension in a modular design. For the two-storey building with about 1,000 square meters 21 modules were installed.
The rooms including the operating room were completely prefabricated in the ADK factory. The entire construction period of the OP extension was 5 months.