SCHOOL BUILDINGS IN MODULAR CONSTRUCTION
Completely equipped and installed in prefabrication.
That means shortest construction time.
The final assembly of the school building can be done during the holidays.
The regular school operation is not disturbed.
Wingert Schule Dreieich
Parkschule Essingen
Parkschule Essingen
Wingert Schule Dreieich
Wingert Schule Dreieich
Implementation of the architect's plan in modular design