SCHOOL BUILDINGS IN MODULAR CONSTRUCTION 


 

Completely equipped and installed in prefabrication.

That means shortest construction time.

The final assembly of the school building can be done during the holidays.

The regular school operation is not disturbed.

 

Do you want to learn more?

 

Implementation of the architect's plan in modular design